In offshore lifting, timing is everything. One of the most critical challenges arises when heavy loads are lifted from a barge or other floating structure. The constant motion of the sea can cause sudden differences in speed between the payload and the crane hook. This often results in a sharp tightening of the rigging—a dynamic shock that can damage the crane, the rigging, or even the payload itself.